Residential
  • Service Availability Charge: $24.00 per month
  • Energy Charge: All kilowatt hours (kWh) at 7.74¢ per kWh
  • Minimum Charge: $24.00 per meter per month unless a higher minimum is established by contract

Schedule 100 — Residential Service (PDF)

Small Commercial
  • Service Availability Charge: $29.48 per month
  • Energy Charge: All kilowatt hours (kWh) at 7.8¢ per kWh
  • Minimum Charge: $29.48 per meter per month unless a higher minimum is established by contract

Schedule 190 — Small General Service (PDF)

Large Commercial
  • Service Availability Charge: $46.74 per month
  • Demand Charge: First 30 KW — $2 per month per KW of Billing Demand
  • Balance: $10.45 per month per KW of Billing Demand
  • Energy Charge for less than 25 KW
    • KW x 200 kWh = Calculated kWh
    • Calculated kWh @ 9.0¢ per kWh
    • kWh — Calculated kWh = Balance @ 4.37¢ per kWh
  • Energy Charge for 25 KW or more
    • First 5,000 kWh @ 9.0¢
    • Balance kWh @ 4.37¢
  • Minimum Charge: $46.74 per meter per month unless a higher minimum is established by contract

Schedule 200 — Large General Service (PDF)

Commercial and Industrial
  • Service Availability Charge: $122.54 per month
  • Demand Charge: $10.38 per month per KW of Billing Demand
  • Energy Charge:
    • 3.627¢ per kilowatt hour (kWh) April through August
    • 4.638¢ per kWh September through March
  • Minimum Charge: $122.54 per meter per month unless a higher minimum is established by contract

Schedule 300 — Commercial and Industrial Service (PDF)

Commercial and Industrial — High Voltage
  • Service Availability Charge: $615.73 per month
  • Demand Charge: $10.43 per month per KW of Billing Demand
  • Energy Charge:
    • 3.77¢ per kilowatt hour (kWh) April through August
    • 4.50¢ per kWh September through March
  • Minimum Charge: $615.73 per meter per month unless a higher minimum is established by contract

Schedule 350 — Commercial and Industrial Service (PDF)

Large Industrial
  • Service Availability Charge: $615.73 per month
  • Demand Charge: $10.43 per month per KW of Billing Demand
  • Energy Charge: 4.50¢ per kWh
  • Minimum Charge: $615.73 per meter per month unless a higher minimum is established by contract

Schedule 360 — Large Industrial Service (PDF)

Street Lights
  • District owned, operated, and maintained:
    • Luminaire only:
      • 100W equivalent HPS or LED (ORN): $19.01
      • 100W equivalent HPS or LED (STD): $17.56
      • 200W equivalent HPS or LED (STD): $19.98
    • Luminaire and wood pole:
      • 100W equivalent HPS or LED (STD): $21.72
      • 200W equivalent HPS or LED (STD): $23.66
    • Luminaire and ornamental pole:
      • 100W equivalent HPS or LED (ORN): $36.60
      • 100W equivalent HPS or LED (STD): $46.21
      • 200W equivalent HPS or LED (STD): $47.74
  • District furnished electricity only:
    • Luminaire only:
      • 200W HPS (STD): $2.84

Schedule 500 — Street Light Service (PDF)

Yard Lights
  • One (1) Sentry Light “I” complete with lamp, 2-1/2 foot arm and photoelectric control:
    • If installed on existing pole: $18.07 per month
    • If a pole and span of wire (150 foot maximum) are required: $23.10 per month
  • One (1) Floodlight luminaire complete with lamp, mounting bracket and photoelectric control:
    • If installed on existing pole: $48.07 per month
    • If a pole and span of wire (150 foot maximum) are required: $53.10 per month
  • One (1) Sentry Light “II” complete with lamp, 10 foot arm and photoelectric control:
    • If installed on existing pole: $31.67 per month
    • If a pole and span of wire (150 foot maximum) are required: $36.71 per month

Schedules 510, 520, 530 — Yard Lighting Service (PDF)

Miscellaneous Fees, Charges, and Deposits
  • New Account Processing Fee: $15
  • Returned Bank Item (including NSF): $25
  • Reconnect of Service After Non-Payment Disconnect fees:
    • During business hours: $30
    • After business hours: $150
    • Non-broadcasting meter reconnect during business hours: $80(1)
  • Tampering Fee: $75 – $500 or actual cost including lost revenue
  • Late Payment Charge: greater of $5 or 1.5% per month(2)
  • Customer-requested meter test: no charge
  • Customer-damaged facility: actual cost
  • Disconnect/reconnect for customer safety:
    • During normal business hours: no charge
  • Trouble call — problem at customer facilities: no charge
  • Trouble call — problem at Central Lincoln facilities: no charge
  • Small bill adjustment for closed accounts: -$2 to $2(3)
  • Transformer, Service, and Meter Fee:(4)
    • Standard Residential Service (up to 200 amp service): $1,000
    • Large Residential Service (201 to 400 amp service): $1,700
    • Special Residential Service (above 400 amp service): calculated
    • Upgrading from existing 200 amp service to 400 amp service: $700
    • Upgrading from 200 amp service to more than 400 amp service: calculated
    • Upgrading from 400 to above 400: calculated
  • Engineering/Re-Engineering/Interconnection Fees:
    • Schedule 100/190/200: $300(5)
    • Schedule 300–350: $1,000
    • New/Increase load 1MW to less than 10MW: $5,000
    • New/Increase load 10MW and above: calculated with $10,000 minimum
  • Non-broadcasting meter fees
    • Meter reading (monthly): $35
  • Customer Deposits:
    • Residential deposit: $200 minimum(6)
    • Commercial deposit: $300 minimum(6)
    • Interest rate on deposits (annually): 0.24%

(1) Non-broadcasting meters will not be reconnected after business hours.

(2) On past due balances of $50 or greater.

(3) If balance owed is $2.00 or less, amount is waived. Accounts with a credit balance of $2.00 or less will be assessed a service fee, equal to the credit balance of the account.

(4) New and existing customers requesting new service or modifications to an existing service may be required to pay the Customer Engineering Fee prior to meeting with a Customer Engineer. The fee is non-refundable but will  be applied towards the Transformer, Service, and Meter Fee.

(5) Any customer service that requires modification at the customer’s request may be charged a Re-engineering Fee. An additional fee may be required if substantial planning and/or engineering work has been completed and the customer identifies different requirements before the new or changed service has been completed.

(6) Or two times the highest bill over the last 12 months at that location, whichever is greater.

Schedule 700 — Miscellaneous Fees, Charges, and Deposits (PDF)