Central Lincoln offers incentives for qualifying solar, wind, hydro, and battery storage systems. Rebates are first-come, first-served and depend on available funds.

How to Apply

  1. Before you install: Submit an Interconnection & Incentive Application for your project type.
  2. Wait for approval: We’ll complete a technical review and confirm next steps.
  3. Install the system (keep it off): Your installer may briefly test equipment, then turn it off.
  4. Final checks: After your green-tagged electrical inspection and net meter installation, we’ll authorize activation.
  5. Get your rebate: Submit the Notice of Project Completion with required documents.

Program Requirements

  1. Contractors must submit an Interconnection and Incentive Application and all required documents listed on the application before starting construction or installation of the generation system (with or without storage).
  2. The customer must agree to the Net Metered Customers Policy (PDF) and sign a Net Metering Agreement.
  3. All renewable energy systems interconnected to Central Lincoln’s system must include a utility-accessible safety disconnect that allows Central Lincoln to safely isolate the system when needed. Specific disconnect requirements are outlined in Central Lincoln’s interconnection policies and application materials.
  4. System Activation Restrictions
    • The generating system must remain off until Central Lincoln has received the green-tagged electrical inspection and installed a net meter (installed in person by Central Lincoln).
    • Brief testing by the installer is permitted, but the system must be turned off immediately after testing and remain off until approval is received.
    • Early activation beyond testing can cause unsafe backfeeding and may result in the suspension of electric service, denial of incentive payments, or both.
  5. Only one incentive will be issued per system. Additions or expansions of an existing system do not qualify for additional incentives.
  6. Central Lincoln may suspend service delivery for violations of program rules or Customer Service Policies.

Storage System Requirement

  • For every 5 kilowatt-hours (kWh) of battery storage, the system must include at least 1 kilowatt (kW), measured in direct current (DC), of nameplate generation capacity.

Incentive Amounts

System Type Incentive Maximum
Battery storage (added to any qualifying system) Purchase price of battery/batteries (receipt required) $2,000
Hydro electric $0.05 per kWh per year $2,000
Solar electric $500 per kW DC $2,000
Wind electric $500 per kW DC $2,000

Program Forms

Submit Forms or Ask Questions

Mail:
Central Lincoln PUD
Attn: Efficiency Rebates
5625 NE Elam Young Parkway
Suite 100
Hillsboro, OR 97124

Email: rebates@esgroupllc.com
Phone: (888) 883-9879.

Rebates are based on the availability of funds and are subject to change at any time without notice.